-
Reliability-Centered Maintenance (RCM) Implementation Steps
20 Lessons-
StartStep 1: System Selection and Information Collection
-
StartStep 2: System Boundary Definition
-
StartStep 3: System Description and Functional Block Diagram
-
StartStep 4: System Functions and Functional Failures
-
StartStep 5: Failure Mode and Effects Analysis
-
StartWhat is Failure Mode and Effects Analysis (FMEA)?
-
StartWhat is Failure Mode?
-
StartExample of Failure Mode Identification
-
StartHidden and Evident Failures
-
StartWhat is Failure Cause?
-
StartFailure Effects
-
StartFailure Consequences
-
StartExample of Step 5: FMEA
-
StartThe RCM Decision Process
-
StartStep 6: Logic Tree Analysis (LTA)
-
StartStep 7: Selection of Maintenance Tasks
-
StartStep 8: Task Packaging and Implementation
-
StartStep 9: Making the Program a Living One — Continuous Improvements
-
StartSummary of RCM
-
StartRCM Examples
-
-
Managing RCM program through the CMMS – KPIs & RCM Metrics – RCM Project Guide
16 Lessons-
StartWhat’s the difference between FMEA and RCM?
-
StartFMEA as a Standing Alone Analysis (not part of RCM)
-
StartFMEA Process
-
StartExample of FMEA Worksheet
-
StartFMEA Worksheet details
-
StartCalculating the RPN
-
StartExamples of FMEA
-
StartExample of FMEA from NASA reference
-
StartIs your CMMS/EAM capable to capture the RCM analysis requirements?
-
StartCurrent failure code hierarchy in most CMMS/EAM systems
-
StartHow to configure your system to capture the RCM analysis requirements on the go?
-
StartManage used Key Performance Indicators (KPIs)
-
StartWhat are KPIs?
-
StartLeading & Lagging KPIs, what is the Difference?
-
StartExamples of Key Performance Indicators (KPIs)
-
StartRelevant RCM Key Performance Indicators (KPIs)
-
-
Project Guide for RCM Implementation
8 Lessons-
StartSection-1: Introduction
-
StartSection-2: An RCM Primer
-
StartSection-3: Deciding to Conduct an RCM Project
-
StartSection-4: Valuable Lessons Learned by Other Organizations
-
StartSection-5: Completing an RCM Study
-
StartSection-6: Implementing the RCM Study
-
StartSection-7: Measuring the Benefits
-
StartUntitled lesson
-
